Owner: KHS, Inc.
General Contractor: Shioi Construction, Inc.
Contract Amount: $377,748.80
Project Description:
The new Luau Building located at Sheraton Kauai Coconut Beach Resort serves as a covered dining and entertainment structure – building area of 6,785 SF. Dining area is 4800 SF with a 320 occupancy. Luau Building also includes food staging, storage and check-in area. Scope of work included erosion control, site demolition, structural excavation, building slab cushion, concrete walkway preparation. Excavation and backfill for interior plumbing, electrical, and gas utilities. Utility work included exterior Fireline (240’ of 8’’ D.I., 80’ of 6’’ D.I., and 90’ of 4’’ D.I. Fireline), 4’’ PVC Sewerline, 4’’ PVC Drainline and 1’’ Cold Water.